Kirkby's Multi-Storey Car Park
Concrete Repairs & Carbon Fibre Strengthening
NDT-led concrete repairs, corrosion treatment and more than 1,500 linear metres of carbon fibre strengthening for a high-load multi-storey car park.
Project details
- Location:
- Kirkby, Merseyside
- Services Delivered:
- CFRP Strengthening; Hand-Applied Mortar Repair; Crack Control; Ferroscan Reinforcement Surveys
- Project Status:
- Complete
Core works:
- NDT condition assessment and targeted concrete repairs
- Corrosion treatment and concrete reinstatement
- Structural strengthening for heavy vehicle loading
Project Overview
Concrete repairs and structural strengthening were completed at Kirkby’s Multi-Storey Car Park by Clan Contracting, following the identification of widespread cracking, spalling, and reinforcement corrosion across a large area.
A targeted repair strategy was developed using non-destructive testing to pinpoint critical zones, reduce unnecessary breakout, and deliver durable repairs suitable for a high-load parking environment.
Scope of Structural Works
- Condition assessment using Ferroscan (NDT) to locate reinforcement and verify cover
- Targeted breakout to expose defective areas and confirm the extent of reinforcement corrosion
- Crack repair strategy selected to accommodate movement and reduce the risk of re-cracking
- Steel preparation: rust removal and corrosion mitigation
- Anti-corrosion priming using Sika MonoTop 610 (zinc-rich primer)
- Concrete reinstatement using Sika MonoTop 615 high-performance repair mortar
- Structural strengthening with 1,500+ linear metres of Sika carbon fibre plates to support vehicle loads without adding significant weight
Kirkby's Multi-Storey Car Park Gallery