Blackpool Victoria Hospital
Concrete Repairs & Protective Coatings
Rope-access inspection, targeted concrete repairs and protective coatings to high-level concrete elements on a live healthcare site.
Project details
- Location:
- Blackpool
- Services Delivered:
- Hand-Applied Mortar Repair; Protective Coatings; Rope-Access Inspections & Defect Mapping
- Project Status:
- Complete
Core works:
- Rope access inspections
- High-level defect mapping
- Concrete repairs
- Protective coatings
Project Overview
Clan Contracting delivered targeted structural repairs at Blackpool Victoria Hospital, focused on extending the service life of high-level concrete elements on a live healthcare site.
Ahead of repairs, we completed close-up façade inspections using rope access to confirm defect locations, extents, and repair boundaries. The project progressed into concrete repairs and the application of specialist protective coatings once the repair scope was finalised.
Scope of Structural Works
- Rope access inspection of high-level concrete elements to confirm defect extent
- Targeted scope definition to identify what required repair (and what didn’t)
- Concrete repairs using Fosroc Renderoc
- Application of specialist protective coatings to improve durability and service life