M62 Bridge
Concrete Sampling & Condition Investigation
Concrete sampling and condition investigations on a bridge associated with the M62 motorway, assessing carbonation, reinforcement cover, moisture and resistivity to inform maintenance decisions.
Project details
- Location:
- M62 motorway
- Services Delivered:
- Concrete Core & Dust Sampling; Carbonation Testing; Reinforcement Cover Checks; Moisture Surveys; Resistivity Measurements
- Project Status:
- Complete
Core works:
- Concrete core drilling
- Concrete dust sampling
- Carbonation-depth testing
- Reinforcement cover checks
- Moisture and resistivity measurements
Project Overview
Clan Contracting undertook concrete sampling and condition investigation on a structure associated with the M62 motorway. The work brought together core drilling and dust sampling with measurements relevant to the condition of the concrete and its reinforcement.
The bridge inspection included carbonation depth, reinforcement cover, moisture distribution and electrical resistivity. These observations were collected to inform maintenance decisions, with each measurement contributing to the wider assessment of deterioration and corrosion risk.
Scope of Structural Works
- Core drilling to obtain concrete samples
- Concrete dust sampling as part of the material investigation
- Carbonation-depth testing at investigation locations
- Measurement of concrete cover to reinforcement
- Moisture mapping within the bridge deck
- Electrical resistivity measurements to support interpretation of concrete condition
M62 Bridge Gallery