Mineral Road Rail Bridge
Corrosion Repairs & Structural Strengthening
Corrosion repairs, new steel beams and long-term protection for a 130+ year-old rail bridge, delivered under our seven-year maintenance contract with Tarmac.
Project details
- Location:
- Mineral Road Rail Bridge
- Client:
- Tarmac (7-Year Maintenance Contract)
- Services Delivered:
- Concrete Reinstatement; Steelwork Strengthening; Brickwork Repairs; Repointing; Façade Cleaning; Anti-Graffiti Coatings
- Project Status:
- Complete
Core works:
- Steel beam installation
- Concrete reinstatement
- Structural strengthening
- Brickwork repairs
- Protective coatings
Project Overview
Under our seven-year maintenance contract with Tarmac, we’ve completed a major package of corrosion repairs and strengthening works at Mineral Road Rail Bridge.
The 130+ year-old structure showed deterioration typical of ageing concrete and embedded steel, with moisture-driven defects accelerating corrosion risk. The works combined targeted investigation, structural repair, and long-term protection to extend service life and improve durability.
Scope of Structural Works
- Breakout of defective concrete to sound substrate
- Installation of new steel beams to strengthen cantilever verges
- Concrete reinstatement to soffits and bearing interfaces
- Removal of deteriorated cill beams and installation of protective RC collar
- Cleansing and painting of existing structural steelwork
- Brickwork cleaning, repointing, and infill of redundant recesses
- Graffiti removal and application of anti-graffiti protective coatings
Mineral Road Rail Bridge Gallery