Oakfield Primary School
Concrete Repairs & Protective Coatings
Concrete repairs, reinforcement treatment and protective coatings at Oakfield Primary School in Widnes, delivered in two phases across successive summer holidays.
Project details
- Location:
- Widnes
- Services Delivered:
- Hand-Applied Mortar Repair; Reinforcement Treatment; Protective Coatings
- Project Status:
- Complete
Core works:
- Targeted concrete breakout
- Reinforcement treatment
- Sika concrete repair system
- Protective coatings
- Two-phase summer programme
Project Overview
Clan Contracting delivered a two-phase concrete repair and protective coating programme at Oakfield Primary School in Widnes. Each phase addressed designated areas of the school, with the first phase starting in 2024 and the second delivered during July and August 2025.
The programme was arranged around the summer holidays. Targeted breakout, reinforcement treatment and concrete reinstatement were followed by protective coatings, bringing repair and protection together within the available school working periods.
Scope of Structural Works
- Targeted breakout of defective concrete in the designated repair areas
- Treatment of exposed reinforcement before concrete reinstatement
- Reinstatement using a high-performance Sika repair system
- Application of protective coatings to reduce carbonation and weather exposure
- Phased delivery across successive summer holidays, with final touches and handover coordinated around the September 2025 return to school